Stock Number: EQC007422
Make: JLG
Model: 600A
Year: 2000


Stock Number: 1-16-600265
Make: Jekko
Model: MPK20
Year: 2017


Stock Number: EQC009956
Make: Daewoo
Model: GC18
Year: 1998


Stock Number: EQC000312
Make: Advance
Model: 3800
Year: 2006


Stock Number: 2-16-230416
Make: Terex-Comedil
Model: CTT331-16 TS23
Year: 2008


Stock Number: EQU005204
Make: Genie
Model: GTH844
Year: 2011


Stock Number: EQU007522
Make: Ottawa
Model: 50
Year: 2006


Stock Number: 2-16-230415
Make: Terex-Comedil
Model: CTT331-16 TS23
Year: 2008


Stock Number: EQU003437
Make: Yale
Model: GDP050
Year: 2011


Stock Number: 208461
Make: Mitsubishi
Model: FG50CN1
Year: 2015


Stock Number: EQC000314
Make: Yale
Model: ERC120HG
Year: 2003


Stock Number: 301791
Make: Daewoo
Model: GC30E-3
Year: 1999


 
Comedil Self Erect Cranes

Comedil Self Erect Cranes

Typically the base which is bolted into a huge concrete pad provides the essential support for a tower crane. The base is connected to a tower or a mast and stabilizes the crane which is connected to the inside of the structure of the building. Often, this attachment point is to a concrete lift or to an elevator shaft.

Typically, the mast is a triangulated lattice structure measuring 10 feet square or 0.9m2. The slewing unit is connected to the very top of the mast. The slewing unit consists of a gear and a motor that enable the crane to rotate.

Tower cranes may have a max unsupported height of 80m or 265 feet, while the minimum lifting capacity of a tower crane is 16,642 kg or 39,690 pounds with counter weights of 20 tons. Additionally, two limit switches are utilized to be able to ensure the driver does not overload the crane. There is also one more safety feature referred to as a load moment switch to make certain that the operator does not surpass the ton meter load rating. Last of all, the maximum reach of a tower crane is 230 feet or 70 meters.

Due to their extreme heights, there is a science involved to erecting a crane. The stationary structure will first need to be brought to the construction location by using a big tractor-trailer rig setup. Then, a mobile crane is used so as to assemble the equipment part of the jib and the crane. Afterwards, these sections are attached to the mast. The mobile crane then adds counterweights. Crawler cranes and forklifts may be some of the other industrial equipment that is utilized to erect a crane.

As the building is erected, mast extensions are added to the crane. This is how the crane's height could match the building's height. The crane crew utilizes what is called a climbing frame or a top climber that fits between the top of the mast and the slewing unit. A weight is hung on the jib by the work crew in order to balance the counterweight. Once complete, the slewing unit is able to detach from the top of the mast. In the top climber, hydraulic rams are used to adjust the slewing unit up an additional 6.1m or 20 feet. After that, the crane driver uses the crane to insert and bolt into place one more mast part piece.

  • Terex Container Forklift
    Terex construction equipment has earned a worldwide reputation for being powerful, dependable and effective. These equipment are ... More
  • Hyster Loaded Container Handlers
    It is suggested to often inspect the front end of your lift truck as part of your pre-shift or daily inspection, in order to help avoid ... More
  • Nissan Double Reach Forklifts
    Narrow aisle trucks or reach trucks have become more common because of their ability to lessen their floor space and aisle count needs. ... More
  • Terex Knuckle Boom Lifts
    Telescoping Boom Lifts Telescoping booms lifts are designed to mount a work bucket on an extendable, straight arm that is located on a ... More
  • Potain Self Erect Cranes
    For big building construction projects, tower cranes are utilized quite often. These machines are rather necessary for heavy lifting as ... More